Standard Lithium filed an NI 43-101 Preliminary Economic Assessment for its Franklin Project in Hopkins, Franklin, and Titus Counties, Texas, outlining a 20-year direct lithium extraction operation. The base case shows an after-tax NPV8 of $4,992 million, a 24% IRR, and a 3.1-year payback, with an upgraded bromine co-product case lifting after-tax NPV8 to $5,560 million. The project holds an estimated 2,128 kt of contained lithium carbonate equivalent (400 kt lithium) in the Smackover Formation, with plans to produce roughly 1,292 kt of LCE over the project life at a $22,400/t lithium price and 89.25% process recovery. Total capital cost is estimated at $3.83 billion.
Key figures
- Payback years
- 3.1
- Contained lce kt
- 2128
- After tax irr pct
- 24
- Project life years
- 20
- Contained lithium kt
- 400
- After tax npv8 million
- 4992
- Before tax npv8 million
- 5924
- Lithium price per tonne
- 22400
- Brine production volume m3
- 528 million m3
- Lithium concentration mg l
- 572
- Total operating costs 20yr million
- 5461
- Lce production kt over project life
- 1292
- After tax npv8 secondary case million
- 5560
- Standard lithium economic interest pct
- 55