Skip to main content
Signal8

Full Access with Signal8 Pro, $49/mo billed annually.

Titan Mining Corp (TII) Form 6-K — Jul 15, 2026

$TIIForm 6-KFiled Jul 15, 2026, 6:00 AM ET0001171843-26-004645Original filing

Titan Mining reported positive metallurgical results for its Kilbourne Graphite Project, validating the concentrator flowsheet with a 95.9% graphite concentrate grade and 91.4% recovery. These figures exceed the Preliminary Economic Assumptions basis of 95% grade and 90% recovery, confirming the design for the feasibility study. The company confirmed a commercial purification process producing battery-grade purity of at least 99.90% fixed carbon and achieved a spherical graphite yield of approximately 66%. This yield significantly surpasses the industry average of roughly 50%, potentially enhancing project economics.

Key figures

Recovery Rate
91.4%
Pea Target Grade
95%
Demo Plant Capacity
1,200 mt per annum
Pea Target Recovery
90%
Concentrate Grade Ct
95.9%
Industry Average Yield
50%
Purification Purity PMG
≥99.90%
Purification Purity SPG
99.99%
Spherical Graphite Yield
66%

AI analysis

Red flags1 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.