OR Royalties Inc. (OR) Form 6-K — Nov 19, 2026
OR Royalties provided an asset update following Agnico Eagle's Capital Markets Day, reaffirming a pathway to approximately 1.0 million ounces of annual gold production by 2033 at the Canadian Malartic Complex, where OR holds 3-5% NSR royalties (blended ~4.61% underground). Odyssey Shaft #1 is 73% complete with first shaft production expected in June 2027, and a conceptual second shaft could add first production in 2033, alongside Marban (120-150koz/yr) and Wasamac satellite mines.
Key figures
- Marban reserves
- 1.6 Moz Au (51.6Mt @ 0.95 g/t)
- Or nsr royalties
- 5.0% Barnat/low-grade stockpiles, 5.0% East Gouldie/Odyssey South/west East Malartic, 3.0% Odyssey North/east East Malartic, 2.0% Upper Beaver, 2.0% Hammond Reef, 0.5% Marban
- Hammond reef reserves
- 3.3 Moz Au (123.5Mt @ 0.84 g/t)
- Canadian malartic target
- ~1.0 Moz annual gold production by 2033
- Odyssey shaft1 completion
- 73%
- Canadian malartic reserves
- ~9.0 Moz Au (169.9Mt @ 1.66 g/t)
- Blended underground nsr rate
- ~4.61%
- Upper beaver first production
- H1 2030
- Hammond reef annual production
- 250-300koz Au over 13-year mine life
- Upper beaver annual production
- ~210koz Au + 3,600t Cu
- Odyssey shaft1 first production
- June 2027
AI analysis
Red flags2 · Pro
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.