Skip to main content
Signal8

Osisko Gold Group Inc. (ODV) Form 6-K — Nov 24, 2026

$ODVForm 6-KFiled Nov 24, 2026, 9:32 AM ET0001171843-26-007673Original filing

Osisko Gold Group reported results from 11,059 m of drilling in 37 holes at the Cariboo Gold Project, extending high-grade mineralization at the Lowhee Zone roughly 500 m along strike and more than 250 m below the current mineral resource. Headline intercepts outside the resource footprint include 104.14 g/t Au over 1.50 m at approximately 600 m vertical depth (including 312.00 g/t Au over 0.50 m) and 16.08 g/t Au over 4.55 m at roughly 325 m depth, highlighting near-mine resource growth potential.

Key figures

Drillholes
37
Best intercept
104.14 g/t Au over 1.50 m at ~600 m vertical depth (incl. 312.00 g/t Au over 0.50 m)
Mineral titles
443
Drilling meters
11,059
First gold pour
Q1 2029
Strike extension m
500
Other key intercepts
["16.08 g/t Au over 4.55 m (~325 m depth)","11.07 g/t Au over 6.35 m (~244 m depth)","75.80 g/t Au over 0.50 m","65.40 g/t Au over 0.50 m"]
Commercial production
H2 2029
Land package hectares
186,740
Depth below resource m
250

AI analysis

Red flags3 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.