LITHIUM AMERICAS CORP. (LAC) Form 10-Q — Aug 13, 2026

$LACForm 10-QFiled Aug 13, 2026, 6:50 AM ET0001193125-26-347826Original filing

Lithium Americas filed its Q2 2026 10-Q showing a swing to profitability, with net income of $1.7 million for the quarter versus a $13.2 million loss a year earlier, and $6.3 million for the first half versus a $24.8 million loss, driven largely by non-cash fair value gains on the Orion convertible embedded derivative and DOE warrant obligations. The company reported approximately $1.3 billion of total cash and restricted cash at June 30, 2026, including $530.3 million held at the Thacker Pass JV, after drawing $774.0 million of DOE loan advances during the half year for cumulative advances of $1.209 billion against the $2.26 billion ATVM facility.

Key figures

EPS
Q2 2026 basic $0.01 / diluted $(0.02); YTD basic $0.00 / diluted $(0.07)
Guidance
2026 Thacker Pass Phase 1 capex $1.3-$1.6 billion; mechanical completion targeted late 2027; production ramp-up during 2028
Net income
Q2 2026 net income $1.7 million (Q2 2025: $(13.2) million); YTD $6.3 million (YTD 2025: $(24.8) million)
Total debt
DOE Loan $988.0 million net carrying value ($1,230.2 million principal); Orion convertible notes $116.0 million principal
Cash position
$1,279.2 million total cash and restricted cash ($822.8 million cash + $456.4 million restricted)
Interest rate
DOE advances 4.41%-4.76% fixed contractual (effective 6.36%-6.89%); Orion Notes 9.875%; Yorkville Debentures 5% stepping to 7.50%/15% on trigger events
Shares outstanding
363,042,943
Jv cash
$530.3 million
Working capital
$1.0 billion
Personnel on site
over 1,600 (expected over 2,000 in H2 2026)
Procurement complete
>80%
Doe loan total capacity
$2.26 billion (reduced to $2.23 billion under OWCA)
H1 2026 ATM net proceeds
$258.2 million ($189.7M Nov 2025 ATM + $68.5M March 2026 ATM)
Yorkville debentures max
$175 million ($150 million initial closing + $25 million optional)
Doe loan cumulative advances
$1.209 billion
Total project capex estimate
$2.93 billion
Detailed engineering complete
>95%
Share count growth six months
314.3 million to 361.8 million
Construction capital capitalized
$1.8 billion
Doe reserve account contribution required
$120 million within 12 months of OWCA

Price after filing

1 day: +4.0%7 days: -8.6%30 days: -10.5%

Close on the filing date to close N calendar days later (from $3.25). Historical, not a forecast.