Turbo Energy, S.A. (TURB) Form 6-K — Oct 6, 2026
Turbo Energy announced that 62.5 MWh of its battery energy storage capacity is now fully operational across three industrial sites in Spain: ECO Porcelánico, Compacglass and TAU Porcelánico. These systems are part of a previously announced $53 million contract to supply and implement 366 MWh of battery storage across 10 factories under the Pamesa Net Zero project. The three operating sites pair the 62.5 MWh of storage with 34 MWp of installed solar, and have avoided 421 metric tons of CO2 since July 2026.
Key figures
- Operating sites
- ["ECO Porcelánico","Compacglass","TAU Porcelánico"]
- Contract value USD
- $53 million
- Factories in contract
- 10
- Co2 avoided metric tons
- 421
- Operational storage mwh
- 62.5
- Separate projects count
- 15
- Pv capacity operating mwp
- 34
- Total contract capacity mwh
- 366
- Storage delivered H1 2026 mwh
- 130
- Separate project portfolio USD
- $3.5 million
AI analysis
Red flags2 · Pro
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.