Skip to main content
Signal8

Bitdeer Technologies Group (BTDR) Form 6-K — Oct 19, 2026

$BTDRForm 6-KFiled Oct 19, 2026, 4:35 PM ET0001213900-26-110703Original filing

Bitdeer reported its September 2026 production and operations update, with AI Cloud revenue backlog tripling to approximately $2.9 billion from $0.9 billion a month earlier, driven by offtake commitments covering more than 70% of its ~21.7MW A201 data center in Johor Bahru, Malaysia, representing over $1.7 billion of expected revenue over five years. The company also disclosed a 16-year colocation lease for its Tydal, Norway campus worth approximately $4.7 billion (up to ~$8.0 billion with an 8-year extension), 200 acres of land acquired near its 563 MW Rockdale facility, and a collaboration with NVIDIA on the Open Agent Safety Platform.

Key figures

EPS
0
Revenue
0
Net income
0
Ai cloud ARR
~$86M
Gpus deployed
4328
Ai cloud pipeline
333.5 MW IT load
Tydal lease value
$4.7 billion over 16-year base term (up to ~$8.0B with 8-year extension)
Co mining hash rate
28.7 EH/s
Colocation rockdale
200 acres acquired near existing 563 MW facility
A201 offtake revenue
>$1.7 billion over 5 years (>70% of ~21.7MW contracted)
Btc mined YoY growth
200% Y/Y (452 BTC in September 2025)
Gpu utilization rate
95% (vs 92% in August)
Self mining hash rate
82.3 EH/s
Ai cloud revenue backlog
~$2.9B (up from $0.9B in August 2026)
Btc mined september 2026
1355
Total proprietary hash rate
86.4 EH/s

AI analysis

Red flags3 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.