Skip to main content
Signal8

AVINO SILVER & GOLD MINES LTD (ASM) Form 6-K — Oct 26, 2026

$ASMForm 6-KFiled Oct 26, 2026, 7:15 AM ET0001477932-26-006444Original filing

Avino Silver & Gold Mines reported high-grade silver intercepts from thirteen infill and extension drill holes at its La Preciosa project in Durango, Mexico, including 616 g/t Ag over 4.86 metres at La Gloria and a 23.60 metre intercept averaging 132 g/t Ag at the La Gloria-Abundancia vein junction. CEO David Wolfin said La Preciosa continues to surprise to the upside, noting that none of these holes nor the majority of 2025 holes were incorporated into the current mineral reserve and resource estimates. The results confirm wider vein structures than initially expected.

Key figures

Holes drilled
13
Wide intercept
132 g/t Ag and 0.37 g/t Au over 23.60 m true width (PMLP 26-23)
Ageq assumptions
$4,000/oz Au and $50.00/oz Ag, 100% metallurgical recovery
Top intercept ag
616 g/t Ag over 4.86 m (PMLP 26-17)
Metres drilled phase
approximately 3,300 m
Program total metres
15000

AI analysis

Red flags3 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.