Gunnison Copper Corp. (GCUMF) Form 6-K — Nov 10, 2026

$GCUMFForm 6-KFiled Nov 10, 2026, 2:04 PM ET0001493152-26-050933Original filing

Gunnison Copper reported initial 2026-2027 drill results confirming high-grade copper-zinc-silver massive sulfides at its Strong & Harris deposit, including 40 feet grading 5.15% copper and 11.99% zinc within a broader 311-foot interval of 1.39% copper and 2.29% zinc. Broad copper mineralization was also hit at the flagship Gunnison Project, with holes NSM-18 and NSM-22 returning 790.3 feet at 0.46% copper and 738.3 feet at 0.43% copper respectively. The company has completed about 28,000 feet of its planned ~138,000-foot, 120-hole drill program.

Key figures

Pea irr
22.5%
Pea npv8
$2 billion
Planned holes
120
Flotation labs
7
Nsm18 interval
790.3 ft grading 0.46% Cu
Nsm22 interval
738.3 ft grading 0.43% Cu
Pea payback years
3.9
Broad interval SHM2
311 ft grading 1.39% Cu, 2.29% Zn, 6.41 g/t Ag
High grade interval
40 ft grading 5.15% Cu, 11.99% Zn, 16.38 g/t Ag
Planned drilling ft
138000
Drilling completed ft
27953
M and i resource tons
846 million tons at 0.33% Cu (5.19 billion lbs Cu)
Drilling completed holes
25
Johnson camp capacity lbs
25 million lbs Cu annually

AI analysis

Red flags3 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.

    Gunnison Copper Corp. (GCUMF) Form 6-K — Nov 10, 2026: AI Analysis | Signal8