Skip to main content
Signal8

Full Access with Signal8 Pro, $49/mo billed annually.

IPERIONX Ltd (IPX) Form 20-F — Sep 29, 2026

$IPXForm 20-FFiled Sep 29, 2026, 4:10 PM ET0001898601-26-000030Original filing

IperionX filed its FY2026 20-F reporting a net loss of $66.8 million (vs $35.3 million in FY2025) with cash of $35.2 million at June 30, 2026. The Virginia campus moved to 24/7 commercial operations, and the company is targeting roughly 200 tpa of titanium powder run rate by end of 2026 at a projected ~$55/kg steady-state cost. The Titan Project DFS completed in June 2026 showed an after-tax NPV8 of $813 million, 39.4% IRR and $1.9 billion forecast after-tax free cash flow over a 14-year mine plan. IperionX also completed the $3.0 million Atlas acquisition from Covia Solutions on July 1, 2026, adding stockpiles and infrastructure adjacent to Titan.

Key figures

Cash Position
35200000
Shares Outstanding
339384066
Ibas award
47100000
Net assets
88300000
Net loss fy2025
35300000
Dpa title iii award
12700000
Long term target tpa
more than 10,000 by 2030
Planned expansion tpa
1400
Titan mine life years
14
Ads price range fy2026
$21.98 to $60.11
Sbir phase iii pathway
99000000
Atlas acquisition price
3000000
Titan dfs after tax irr
39.4%
Titan dfs after tax npv8
813000000
Non affiliate market value
approximately US$1.00 billion (Dec 31, 2025)
Nameplate capacity increase
125 tpa to ~200 tpa
Targeted powder run rate tpa
approximately 200 by end of calendar 2026
Titan forecast after tax fcf
1900000000
Projected steady state unit cost
$55/kg at full utilization
Operating and investing cash outflow fy2026
63500000

AI analysis

Red flags6 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.