Integra Resources Corp. (ITRG) Integra Resources Corp. is a mineral resource firm that specializes in acquiring, exploring, and developing mining properties throughout the Americas. The core of its operations centers on advancing the DeLamar Project, which includes the DeLamar and Florida Mountain gold and silver deposits. Situated in Owyhee County, southwestern Idaho, this project spans approximately 8,673 hectares. Its extensive land package comprises 790 unpatented lode, placer, and millsite claims, alongside 16 tax parcels. Established in 1997, the company initially operated as Mag Copper Limited before rebranding to Integra Resources Corp. in August 2017. Integra's corporate headquarters are located in Vancouver, Canada.
Sector: Gold and Silver Ores
Industry: Other Precious Metals
Integra Resources Corp. NYSE:ITRG Basic Materials · Other Precious Metals
Mkt Cap $300.63M
EV -
SI 3.0%
Net Cash/Sh -
CLOSED · Nov 25 +2.78%$1.48 CLOSED · Nov 25 Prev close $1.44 +2.78%Close $1.48 0.00% AH close $1.48 VOL 2.71M $ Vol $3.88M RVOL 1.19x
Mkt Cap $300.63M
EV -
VOL 2.71M sh
$ Vol $3.88M
RVOL 1.19×
SI 3.0%
Net Cash/Sh -
Press Release
Integra Reports Third Quarter 2026 Results from Florida Canyon: Increase in Quarterly Gold Production and Strengthened Financial Position; Provides Operational Update
Integra Resources reported Q3 2026 revenue of $72.4 million with net earnings of $12.9 million ($0.06 per share), a swing from a $8.2 million loss a year earlier, driven by record mining rates of 97,428 tonnes per day at Florida Canyon. However, the company cut its 2026 production guidance roughly 15% to 59,000-62,000 ounces (from 70,000-75,000) because leaching rates have not kept pace with mining, and it will reduce mining rates for the rest of the year. Free cash flow fell to $11.1 million from $20.2 million as operating cash flow declined and costs rose; the balance sheet strengthened to $119.5 million in cash.
• 14d ago AI analysis › Press Release
Integra Announces Third Quarter Gold Production of 17,652 ounces, Demonstrating Continued Growth in Mining and Gold Production at Florida Canyon
Integra Resources produced 17,652 ounces of gold at Florida Canyon in Q3 2026, up 8% quarter-over-quarter and 40% from Q1, with record mining rates averaging 97,428 tonnes per day. Ore mined rose 21% and ore placed on heap leach pads rose 25% sequentially; the company reaffirmed its full-year guidance of 70,000-75,000 ounces. Integra holds $119 million in cash and continues work on the Central Pit pre-stripping campaign, DeLamar permitting toward an FID expected in H2 2027, and Nevada North economic studies.
• 1mo ago AI analysis › Press Release
Integra Provides DeLamar Project Update: Detailed Engineering, Permitting, Procurement and State of Good Repairs Work Advancing in Line with Plan, Appoints GenCap as Project Financing Advisor
Integra Resources provided an update on the DeLamar Gold-Silver Project, confirming detailed engineering, procurement, permitting, and state-of-good-repair work are advancing in line with plan toward a Final Investment Decision expected after the EIS and Record of Decision in the second half of 2027. The company appointed GenCap Mining Advisory as project financing advisor to structure capital alternatives well ahead of FID, and expects principal long-lead equipment purchases (Merrill-Crowe plant, crushing facility, electrical equipment) to be ordered by end of 2026.
• 1mo ago AI analysis › Press Release
The Pentagon's Chinese Tungsten Ban Starts in 15 Months
This GlobeNewswire item is a paid Energy Metal News commentary sponsored by Western Star Resources ($100,000 fee to Market Equities Limited) discussing the DFARS 252.225-7052 ban on defense procurement of Chinese tungsten effective January 1, 2027. Hudbay Minerals (HBM) is mentioned only as sector context; the article recaps its Snow Lake enhanced mine plan extending reserve life to 2043 with 60% more life-of-mine gold (2.8M oz) and its Mason copper project in Nevada, and notes HBM was named to the TSX30 after a 427% three-year share price gain.
• 1mo ago AI analysis › Press Release
Integra Identifies New Near-Mine Gold Growth Targets at Florida Canyon, including 1.30 g/t Au over 62.5 m and 0.59 g/t Au over 167.6 m Inter-Pit and 0.48 g/t Au over 54.9 m in New Madre Shear North Target
Integra Resources reported new drill results from its producing Florida Canyon Mine in Nevada, headlined by 1.30 g/t Au over 62.5 m and 0.59 g/t Au over 167.6 m in the Inter-Pit area between the Central and Radio Tower open pits. A newly identified Madre Shear North Target returned 0.48 g/t Au over 54.9 m, with roughly 2,000 m drilled to date and another 2,000 m planned; the zone sits beneath the North Dump and could become accessible as dump material is mined.
• 2mo ago AI analysis › Press Release ● Major
INTEGRA REPORTS SECOND QUARTER 2026 RESULTS; 30% INCREASE IN QUARTERLY GOLD PRODUCTION, RECORD TOTAL TONNES MINED AND STRENGTHENED FINANCIAL POSITION
Integra Resources delivered strong Q2 2026 results with gold production rising 30% quarter-over-quarter to 16,379 ounces, driven by record mining rates at the Florida Canyon Mine. Revenue increased to $70.8 million compared to $61.1 million in the prior year, while free cash flow more than quadrupled to $9.3 million, bolstering the cash balance to $111.1 million.
• 3mo ago AI analysis › Press Release ● Major
INTEGRA FILES FEASIBILITY STUDY AND UPDATED LIFE OF MINE PLAN TECHNICAL REPORT FOR THE PRODUCING FLORIDA CANYON MINE
Integra Resources filed a Feasibility Study for the Florida Canyon Mine, outlining a 74% increase in Proven and Probable reserves to 1.19 million ounces of gold. The updated Life of Mine Plan projects an 8-year operating life with a 17% increase in average annual production to 82,000 ounces, driving a base case after-tax NPV of $601 million.
• 3mo ago AI analysis › Press Release ● Major
INTEGRA REPORTS RECORD MINING AND ORE-STACKING RATES AT FLORIDA CANYON, 30% INCREASE IN SECOND QUARTER GOLD PRODUCTION
Florida Canyon gold production increased 30% quarter-over-quarter to 16,379 ounces in Q2 2026, driven by record total material movement and a 45% increase in ore placed on heap leach pads. The mine achieved an average mining rate of 87,867 tonnes per day with a strip ratio of 0.81, reflecting the successful integration of new mining equipment.
• 4mo ago AI analysis › Press Release
INTEGRA REPORTS VOTING RESULTS OF ANNUAL GENERAL MEETING OF SHAREHOLDERS
Integra Resources Corp. reported voting results from its Annual General Meeting held June 26, 2026, where 71.9 million shares were voted representing 35.55% of outstanding shares. Shareholders elected all eight director nominees, including President and CEO George Salamis, and appointed BDO Canada LLP as auditor, with all items receiving at least 96% favorable votes.
• 4mo ago AI analysis › Press Release ● Major
FLORIDA CANYON FEASIBILITY STUDY DELIVERS SUBSTANTIAL INCREASE IN MINERAL RESERVE, GOLD PRODUCTION OVER AN 8-YEAR MINE LIFE AND US$0.8 BILLION IN AFTER-TAX FREE CASH FLOW; PROVIDES OPERATIONAL UPDATE
Integra Resources released a Feasibility Study for the Florida Canyon Mine showing a 74% increase in Proven and Probable Mineral Reserves to 1.19 million ounces and an extended mine life to 2033. The study outlines an average annual gold production of 82,000 ounces over an 8-year operating mine life, representing a 17% increase from previous estimates. Economics indicate the project will generate approximately $0.8 billion in after-tax free cash flow with a base case after-tax NPV of $601 million and a Life-of-Mine AISC of $2,331 per ounce. The company plans $92 million in growth capital, including $55 million for heap leach pad expansion and $37 million for fleet modernization.
• 5mo ago AI analysis › Press Release
INTEGRA APPOINTS AUSENCO TO LEAD DETAILED ENGINEERING AT DELAMAR, NEPA PUBLIC SCOPING PERIOD UNDERWAY
Integra Resources has appointed Ausenco Engineering USA South Inc. to lead detailed engineering for its DeLamar Project in Idaho, with SLR Consulting retained for heap leach and metallurgy expertise. The appointment coincides with the start of the 30-day public scoping period for the National Environmental Policy Act (NEPA) review, following the Bureau of Land Management's Notice of Intent. Detailed engineering will continue through Q1 2027, with long-lead procurement starting in H2 2026.
• 5mo ago AI analysis › Press Release
INTEGRA ANNOUNCES THE PUBLICATION OF FEDERAL NOTICE OF INTENT, A SIGNIFICANT PERMITTING MILESTONE FOR DELAMAR
Integra Resources announced that the U.S. Bureau of Land Management published the Notice of Intent for the DeLamar Project in the Federal Register. This action formally initiates the National Environmental Policy Act review process, including the preparation of an Environmental Impact Statement and public scoping.
• 5mo ago AI analysis › Press Release
INTEGRA STRENGTHENS ITS LEADERSHIP TEAM WITH THE APPOINTMENT OF THREE SEASONED MINING EXECUTIVES
Integra Resources appointed three seasoned mining executives to senior leadership roles: Scott Trebilcock as SVP Corporate Development, Whitney Buhlin as VP Human Resources, and Josh Serfass as VP Business Development & Investor Relations. The appointments are described as completing the final key additions to the executive team, positioning the company for its next phase of growth as a diversified U.S.-focused gold producer.
• 6mo ago AI analysis › Press Release
INTEGRA ENTERS INTO EQUITY AGREEMENT WITH THE SHOSHONE-PAIUTE TRIBES
Integra Resources Corp. has entered into an equity agreement with the Shoshone-Paiute Tribes, granting 517,103 common shares with an aggregate value of US$1.5 million. The shares are priced at C$3.97, reflecting the closing price on the TSX Venture Exchange prior to the agreement. This partnership is intended to support long-term economic opportunities for the Shoshone-Paiute Tribes and reinforce a collaborative framework for the DeLamar Project.
• 6mo ago AI analysis › Press Release ● Major
INTEGRA REPORTS FIRST QUARTER 2026 RESULTS; RECORD TOTAL TONNES MINED, AND STRENGTHENED FINANCIAL POSITION
Integra Resources reported Q1 2026 revenue of $61.7 million, up from $57.0 million in the prior year, with adjusted earnings doubling to $0.07 per share. Operational highlights included record total tonnes mined of 6.9 million and record average realized gold prices of $4,854 per ounce, driving mine operating earnings to $24.9 million. The company significantly strengthened its balance sheet, closing the quarter with $105.8 million in cash following a $57.5 million net bought deal offering.
• 6mo ago AI analysis › Press Release ● Major
INTEGRA RECEIVES FINAL APPROVAL OF EXPLORATION PLAN OF OPERATIONS FOR THE WILDCAT DEPOSIT, ADVANCING NEVADA NORTH PROJECT TOWARD PRE-FEASIBILITY STUDY
Integra Resources secured final approval for the Exploration Plan of Operations at the Wildcat deposit, receiving the NEPA Decision Record and Reclamation Permit from U.S. and Nevada authorities. The authorization enables expanded exploration and development activities, moving the Nevada North Project toward a Pre-Feasibility Study targeted for the second half of 2027.
• 6mo ago AI analysis › Press Release
INTEGRA ANNOUNCES FIRST QUARTER PRODUCTION RESULTS FROM THE FLORIDA CANYON MINE AND STRENGTHENED BALANCE SHEET
Integra Resources reported record mining rates of 76,800 tpd at the Florida Canyon Mine during Q1 2026, producing 12,635 ounces of gold. Despite temporary leach pad constraints deferring approximately 3,000 ounces, the company maintained full-year production guidance of 70,000 to 75,000 ounces. The company strengthened its balance sheet with a $61M bought deal public offering, ending the quarter with cash and equivalents of $105.6 million.
• 7mo ago AI analysis › Press Release
INTEGRA GRANTS ANNUAL INCENTIVE AWARDS
prnewswire.com • 7mo ago For AI assistants and agents: search Signal8 with https://signal8.ai/.well-known/search?q=your+question (Markdown results with dated figures and links to cite), or add ?format=md to any Signal8 page URL for a Markdown copy. How it works .